General Scope of Project

The remodel included a complete overhaul of stairways with specially designed chandeliers, new flooring and wall covering throughout and a upscale refinish of lounge area on the second floor. The entire interior of the sales arena was demolished and  new seating, carpet, complete with a wood podium and rear wall were added. Lighting scheme was carefully redesigned  to create a warm, comfortable space for visitors and distinguished guests alike.

Owner

Fasig-Tipton Company, Inc.
2400 Newtown Pike
Lexington, KY 40511

Boyd Browning
(859) 255-1555

Architect

Ben Palmer-Ball PLLC
3900 Hooper Station
Shelbyville, KY 40865

(502) 345-9559

Construction Cost

$1,327,189

Construction Duration

Completed July 2007

Construction Square Footage

25,000